๐Ÿ

Bee Pop-Up Store Assembly Manual

Visual Connection Guide for Easy Setup

๐Ÿ”— Connection System - Visual Guide

๐Ÿ’ก Key Point: The structure has a PINE WOOD back wall and two ALUMINUM FRAME side walls with perspex panels. These connect together using hinges and locks.

Structure Layout - Top View

SIDE WALL
Aluminum Frame + Perspex
HINGE
BACK WALL
Pine Wood
"BEE HAPPY"
HINGE
SIDE WALL
Aluminum Frame + Perspex

Front is OPEN (no wall or door)

Connection Method 1: Piano Hinges (Permanent)

Purpose: Connect pine back wall to aluminum side walls

๐Ÿ“ Location: Full vertical height on each side of back wall (2 hinges total)
How Piano Hinges Work:
๐Ÿ“‹ ๐Ÿ”— ๐Ÿ“‹
FOLDED FLAT
For transport
โ†’
๐Ÿ“‹
|๐Ÿ”—
๐Ÿ“‹โ”โ”๐Ÿ“‹
UNFOLDED 90ยฐ
Ready to lock
๐Ÿ”ง Installation:
  • One hinge leaf screwed to pine back wall edge
  • Other hinge leaf bolted to aluminum side frame
  • Continuous hinge runs full wall height (~2m)
  • Use stainless steel screws/bolts for durability
โœ… Advantages: Fastest setup, no loose parts, folds completely flat, strong connection

Connection Method 2: Cam Lock System (Quick Release)

Purpose: Lock walls at 90ยฐ angle when erected

๐Ÿ“ Location: Top and bottom corners where back wall meets side walls (4-6 locks total)
UNLOCKED

Cam bolt horizontal
Panels can fold

โŸฒ 90ยฐ
LOCKED

Cam bolt vertical
Panels held at 90ยฐ

TOOL NEEDED

Allen key (hex wrench)
Usually 5mm or 6mm

๐Ÿ”ง How to Use Cam Locks:
  1. Unfold walls: Open side panels from back wall to 90ยฐ
  2. Align holes: Match up pre-drilled cam lock holes in both panels
  3. Insert cam bolt: Push bolt through both panels
  4. Lock: Insert Allen key and rotate 90ยฐ clockwise
  5. Test: Try to move panels - should be rigid
Cam Lock Placement:
๐Ÿ”’ Top of left corner (back-to-side)
๐Ÿ”’ Bottom of left corner (back-to-side)
โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€โ”€
๐Ÿ”’ Top of right corner (back-to-side)
๐Ÿ”’ Bottom of right corner (back-to-side)

Connection Method 3: Roof Mounting

Purpose: Secure pine roof to wall structure

PINE ROOF PANEL
๐Ÿ
SIDE
BACK
SIDE
๐Ÿช
Hook Clips

Hook over wall frame, under roof edge

๐Ÿ”ง
Toggle Clamps

Quick-release lever system

๐Ÿ”ฉ
Wing Bolt Clips

Hand-tighten, no tools needed

๐Ÿ“ Clip Placement: 6-8 clips around perimeter (2-3 per wall edge)

Connection Summary

STEP 1
๐Ÿ“‹โ”๐Ÿ”—โ”๐Ÿ“‹
Hinges allow unfolding
โ†’
STEP 2
๐Ÿ”’ ร— 4
Cam locks hold 90ยฐ
โ†’
STEP 3
๐Ÿ 
Roof clips secure top
โ†’
READY!
๐Ÿ
Stable structure
โš ๏ธ Critical Connection Points:
  • All cam locks must be fully rotated 90ยฐ and tight
  • Piano hinges should move smoothly without binding
  • Roof clips must grip both roof and wall frame
  • Check connections before each use

๐Ÿ“ฆ Components & Hardware

Main Structural Components

๐Ÿชต
Pine Back Wall

Solid pine wood panel with "BEE HAPPY" text

Approx. 2m (H) ร— 2m (W)

๐ŸชŸ
Aluminum Side Walls (ร—2)

Aluminum frames holding yellow-tinted perspex panels

Approx. 2m (H) ร— 1.5m (D)

๐Ÿ 
Pine Roof Panel

Waterproof-coated pine with mounted bee statue

Flat/slightly sloped design

๐Ÿ“
Base Platform

Wooden base with laminated square-pattern flooring

Foundation for structure

Connection Hardware

๐Ÿ”—
Piano Hinges (ร—2)

Length: ~2m each (full wall height)

Material: Stainless steel

Purpose: Connect back to sides

๐Ÿ”’
Cam Locks (ร—4-6)

Type: Furniture-style cam lock

Tool: Allen key (5-6mm)

Purpose: Lock corners at 90ยฐ

๐Ÿช
Roof Clips (ร—6-8)

Type: Hook or toggle clamps

Material: Steel or aluminum

Purpose: Secure roof to walls

๐Ÿ“Œ
Ground Stakes (ร—4)

Length: 30-40cm

Material: Steel

Purpose: Anchor to ground

Tools Required

๐Ÿ”ง
Allen Key Set

For cam locks (5mm & 6mm most common)

๐Ÿ”จ
Rubber Mallet

For driving ground stakes

๐Ÿ“
Spirit Level

Ensure walls are vertical

๐Ÿงค
Work Gloves

Protect hands during assembly

๐Ÿ”จ Step-by-Step Assembly

โฑ๏ธ Time Required: 30-45 minutes with 2 people
1 Position Base Platform

Place wooden base on level ground, laminated flooring facing up. Orient with open front toward desired direction.

2 Unfold Wall Panels

The three walls are hinged together and fold flat for transport.

  • Lay folded wall assembly flat on base
  • Pine back wall is in the middle
  • Aluminum side walls fold outward via piano hinges
  • Person 1 holds back wall stable
  • Person 2 unfolds each side wall to 90ยฐ
๐Ÿ“‹โ”โ”๐Ÿ“‹ โ†’ ๐Ÿ“‹
โ”โ”โ”
โ”โ”๐Ÿ“‹โ”โ”๐Ÿ“‹
3 Lock Corners with Cam Locks

Secure each corner where back wall meets side walls.

  • Align pre-drilled holes at each corner (top & bottom)
  • Insert cam bolt through holes in both panels
  • Insert Allen key into cam mechanism
  • Rotate 90ยฐ clockwise until tight
  • Repeat for all 4-6 cam locks
  • Test rigidity - panels should not move
โš ๏ธ Important: Ensure panels are at exact 90ยฐ angle before locking. Use a square or measure diagonal distances to verify.
4 Secure Walls to Base

Attach wall assembly to wooden base platform using brackets or bolts at the bottom of each wall panel.

  • Use spirit level to check walls are vertical
  • Tighten all base connections firmly
5 Install Roof Panel

REQUIRES 2 PEOPLE - Roof is heavy and awkward to handle.

  • Both people lift pine roof panel from opposite sides
  • Ensure bee statue faces forward (open front)
  • Position roof on top of all three walls
  • Adjust for even overhang on all sides
  • Attach roof clips around perimeter:
    • 2-3 clips on back wall edge
    • 2 clips on each side wall edge
    • Hook clips over wall frames and under roof edge
    • Tighten or lock each clip
  • Verify roof is stable and won't shift
6 Anchor Structure

Prevent movement and tipping.

  • Outdoor/Grass: Hammer ground stakes through base corners into earth
  • Indoor/Hard Surface: Place sandbags or water weights at base corners
  • Test stability by gently pushing structure
7 Position Display Items
  • Place display tables inside structure
  • Position honeycomb flower display
  • Arrange for good customer flow
8 Final Safety Check

โœ… Checklist before opening:

  • All cam locks fully engaged and tight
  • Roof clips secure on all sides
  • Structure doesn't wobble when pushed
  • Base is level and stable
  • No sharp edges exposed
  • Perspex panels clean and intact
  • Ground stakes fully inserted (if outdoor)
๐ŸŽ‰ Assembly Complete! Your Bee Pop-Up Store is ready for business. Stock your products and welcome customers!

Disassembly (Reverse Order)

Clear displays
โ†’
Remove stakes
โ†’
Unclip roof
โ†’
Unlock cam locks
โ†’
Fold panels flat
โ†’
Load for transport
โฑ๏ธ Disassembly Time: 20-30 minutes

Store folded panels flat to prevent warping. Keep all hardware in labeled bags.

๐Ÿ“‹ Overview & Specifications

Structure Design

The Bee Pop-Up Store is a three-walled portable retail structure featuring:

Key Specifications

๐Ÿ“
Dimensions

~2m (W) ร— 1.5m (D) ร— 2m (H)

โš–๏ธ
Weight

~35-40 kg fully assembled

โฑ๏ธ
Setup Time

30-45 minutes (2 people)

๐Ÿšš
Transport

Folds flat for truck bed

Design Features

โœจ Portability: Piano hinge system allows panels to fold completely flat. No loose panels to track.
โšก Quick Setup: Cam lock system provides tool-assisted but fast corner locking (90ยฐ rotation).
๐Ÿ’ช Durability: Aluminum frames are lightweight but strong. Pine wood components resist wear.
โ˜” Weather Resistant: Waterproof roof coating protects from rain. Structure can withstand moderate weather.
๐ŸŽจ Visual Appeal: Honeycomb patterns, bee statue, and yellow-tinted perspex create instant brand recognition.

Safety Guidelines

โš ๏ธ Always Follow These Rules:
  • Never attempt solo assembly - requires 2 people minimum
  • Wear work gloves when handling aluminum and wood
  • Work on level ground only
  • Don't set up in winds exceeding 40 km/h (25 mph)
  • Always anchor structure with stakes or weights
  • Inspect all connections before each use
  • Don't overload roof with additional weight
  • Disassemble if severe weather is forecast

What Makes This System Work

The Connection Strategy

The structure uses a hybrid connection system that balances portability with stability:

PERMANENT CONNECTIONS

Piano hinges keep panels together during transport and storage. No loose parts.

REMOVABLE CONNECTIONS

Cam locks and roof clips allow quick assembly/disassembly while providing rigid structure.

This means:

  • โœ… Walls unfold as one unit (hinges)
  • โœ… Corners lock rigid at 90ยฐ (cam locks)
  • โœ… Roof attaches/detaches quickly (clips)
  • โœ… Everything folds flat for transport (hinges again)

Troubleshooting

Structure Wobbles

โ†’ Tighten all cam locks
โ†’ Check ground is level
โ†’ Add more stakes/weights

Panels Won't Lock at 90ยฐ

โ†’ Check hinge alignment
โ†’ Verify cam holes aligned
โ†’ Clean debris from locks

Roof Doesn't Sit Flush

โ†’ Verify 90ยฐ wall angles
โ†’ Check walls are same height
โ†’ Adjust clip positions

Hinges Stiff/Squeaky

โ†’ Apply silicone lubricant
โ†’ Work back and forth
โ†’ Check for bent pins

๐Ÿ

Need Help?

Contact support if you have questions about assembly or need replacement parts.

๐Ÿ“ง support@beepopup.com | ๐Ÿ“ž [Your phone number]